All Documents

Primary tabs

Titlesort ascending Details Type Extension
Communication and Outreach Annual Report 2016-17

This annual report provides an overview of the District’s Communication Tools and Public Outreach Programs for Fiscal Year 2016–17.

Report pdf
Collection Policy 500‐004

This policy enumerates Soquel Creek Water District’s administrative actions for the collection of delinquent accounts, including notifications, fee assignments and discontinuation of service. 

Publication pdf
City of Santa Cruz Intertie Blending Analysis - Water Quality Impacts Assessment Technical Memorandum Report pdf
Bonita Well DWSAP Summary

Drinking Water Source Assessment Update Summary

Report pdf
Bench-Scale Testing Technical Memorandum

Water Quality Assessment - City of Santa Cruz Water Department & Soquel Creek Water District

Report pdf
Backflow Requirements Form

For new Development or remodel projects.  Helps determine if your water service needs a backflow prevention device or not.

Form pdf
Backflow Prevention and Cross-Connection Control Policy and Procedures Report pdf
Aptos Jr. High Well DWSAP Summary

Drinking Water Source Assessment Summary

Report pdf
Aptos Creek Well DWSAP Summary

Drinking Water Source Assessment Update Summary

Report pdf
Application for Alternate Water Metering System

Application to opt out of receiving an Automatic Meter Reading meter. 

Form pdf
Application for Alternate Metering System - AMI Opt-Out

Application to opt out of receiving an Advanced Metering Infrastructure (AMI) meter register and receive an alternate metering system.
 

Form pdf
Applicant Installed Service Guidelines

This form shows the process for installing a water service.

Form pdf
Altivo Well DWSAP Summary

Drinking Water Source Assessment Update Summary

Report pdf
2018 Consumer Confidence/Water Quality Report

Soquel Creek Water District is proud to report that in 2018 the District’s water met all established drinking water health standards set by the U.S. Environmental Protection Agency (USEPA) and the State Water Resources Control Board (State Water Board).

Report pdf
2017 Consumer Confidence / Water Quality Report Report pdf
2016 Consumer Confidence - Water Quality Report Report pdf
2015 Urban Water Management Plan

All water providers that have over 3,000 service connections or annually supply 3,000 acre-feet of water or more, must complete a new Urban Water Management Plan every five years. The plan requires that water suppliers ensure adequate supplies for their current and future customers. Supplies and demands must be assessed over a 20-year planning horizon and must consider various water shortages, including short-term water supply emergencies and drought.

Report pdf
2015 Soquel Community Survey

Phone Survey conducted in 2015 for Soquel Creek Water District.

Report pdf
2015 Consumer Confidence - Water Quality Report Report pdf
2014 Consumer Confidence - Water Quality Report Report pdf
2014 Community Outreach Report

Report includes a summary of the 2014 Community Outreach Efforts by Soquel Creek Water District:

  • Goals
  • Strategies and Focus Areas:  Approach, Initiatives, Outcomes, and Recommendations
Report pdf
2014 Annual Review and Report (ARR) for the Soquel-Aptos Groundwater Basin Management Area

The AB3030 Groundwater Management Plan for the Soquel-Aptos Area calls for an Annual Review and Report (ARR) on the state of the basin prepared by the consulting hydrologist with assistance from Soquel Creek and Central Water District staff. This report is for Water Year 2014.

Report pdf
2013 Public Health Goals Report

Soquel Creek Water District, June 4 ,2013

Report pdf
2013 Financial Report Report pdf