Forms

Primary tabs

Title Details Extension
Water Demand Offset Program Applicant Agreement

Water Demand Offset (WDO) program applicant agreement describing the terms and conditions of the new water service process and water demand ofsfet program.

pdf
Residential Toilet Rebate

Application to replace a 1.6 gallon per flush (gpf) or greater toilet with a 1.0 gpf or lower model and receive up to $100.

pdf
Application for Alternate Metering System - AMI Opt-Out

Application to opt out of receiving an Advanced Metering Infrastructure (AMI) meter register and receive an alternate metering system.
 

pdf
S-3 Domestic Submittal and Shop Drawing Transmittal Form

S-3 Domestic Submittal and Shop Drawing Transmittal Form

pdf
S-17 2inch Fire Service Submittal and Shop Drawing Transmittal Form

S-17 2inch Fire Service Submittal and Shop Drawing Transmittal Form

pdf
S-20 2inch Fire and Domestic Submittal and Shop Drawing Transmittal Form

S-20 2inch Fire and Domestic Submittal and Shop Drawing Transmittal Form

pdf
Monterey Bay Friendly Garden Grant Application

The District currently provides the Monterey Bay Friendly Garden Grant, a grant, of up to $10,000 for local non-profit organizations seeking financial support to fund innovative projects which encourage public acceptance, desire for, and use of water-wise landscaping.

pdf
Graywater Rebate

Get up to $400 per household for laundry to landscape or up to $1,000 for dual plumbed systems!

pdf
Process Flow Diagram for New Construction Accessory Dwelling Units

Process flow diagram which details the complete process for obtaining water approval for new construction accessory dwelling units.

pdf
New Applicant Offset-Generating Project Proposal Application

Applicants for new or expanded water service may propose their own offset generating project to the Board of Directors using this form.

pdf
Toilet Direct Installation WDO Forms and Instructions

An instruction sheet on how applicants for new water service may directly install toilets in homes in the District to fulfill one-half of their Water Demand Offset (WDO) program requirement. Attached to the Instruction sheet are examples of the three necessary forms to be handed out of completed during the retrofit process.
 

pdf
Process Flow Diagram for Commercial Development

Process flow diagram which details the complete process for obtaining new water service for commercial, multifamily, institutional, and industrial developments.

pdf
Process Flow Diagram for Residential Development

Process flow diagram which details the complete process for obtaining new water service for a Tier I or Tier II residential developments, or commercial development which does not require an infrastructure agreement.

pdf