14-012 Service Area 3 to 4

This project is to install approximately 1,900 linear feet (LF) of 12-inch PVC pipe to convey water from the District's Service Area 3 to Service Area 4. The pipeline will span from the southeastern end of Sumner Avenue to the southwestern end of Camino Al Mar, going across farmland. Approximately 1,225 LF of this pipeline will be installed using an open trench method with an approximate width of 26 inches and depth of 52 inches and will be located entirely within a 10-foot (ft) wide easement across three parcels (dirt road adjacent to farmland), as well as in public right-of-way. Approximately 675 LF of pipeline will be installed using directional drilling to pull pipe underneath a Eucalyptus grove. The project includes a Pressure Regulating Station that will be placed in an underground vault in Sumner Avenue. Other project components include an above ground utility box, and a 12 ft tall pole mounted radio antenna for controlling the PRV station remotely. The proposed pipeline and appurtenances will be constructed in accordance with the District's Design and Construction Specifications.

Open to Bids: No
Location: Aptos
Project CWO: 14-012
Pre Bid Meeting Date: Monday, July 2, 2018 - 2 pm.
Pre Bid Meeting: Not Required
Bid Opening Date and Time: Thursday, July 12, 2018 - 2 pm.