Project Bids
For construction or engineering questions, contact the engineering department at (831) 475-8500 or email michaelw@soquelcreekwater.org.
Bidder Notification
- Amendment to Soquel Creek Water District Standard Specifications and Standard Plans dated 1994 regarding mandatory arbitration
- The information posted on this website is for informational purposes only. All formal bids (bids that require a bid bond/payment bond/performance bond) must be submitted within a bound set of specifications originally produced by the District. Bound sets of specifications may be obtained at the District office at 5180 Soquel Drive, Soquel. Click here to request a set of bound specifications. Please include the project CWO number in the subject line of your email. Bids submitted on electronic documents not originally produced by the District may not be accepted.
Projects Currently Out to Bid
None at this time.
Pre-Bid Meetings
None at this time.
Bid Results
Archive Bid Results 2002-2009
- CWO 09-107, Vienna Woods Main Replacement, Bid Opening on 09/08/09 2pm
- CWO 08-031, Barrett Way Main Replacement, Bid Opening on 07/02/09, 2pm
- CWO 09-110, Vista Del Mar Booster Station Site Improvements, Bid Opening on 06/10/09, 2pm
- CWO 09-104, Estates Treatment Plant Exterior Recoat, Bid Opening on 06/10/09, 2pm
- CWO 09-152, Toilet Installation Project, Bid Opening on 03/31/09 2pm
- CWO 08-050, Fire Hydrant Relocations at 1435 Wharf Rd. ad 870 Balboa Ave., Bid Opening on 11/21/08 2pm
- CWO 08-042, Seacliff Area Main Replacement Phase II, Bid Opening on 11/12/08 2pm
- CWO 08-014, Larkin Valley Tank Recoat, Bid Opening on 10/29/08 2pm
- CWO 09-131, Meter Replacement Project
- CWO 08-06, Seacliff Area Main Replacements
- CWO 06-29, Fire Hydrant Upgrades at Greenbrier, Tamarack, and Pebble Beach Drives, and Valve Insertion in Pinehurst Drive, Bid Opening on 10/30/07 2pm
- CWO 08-10, Fire Hydrant Installation @ 3777 Falconer Dr., Bid Opening on 10/9/07 2pm
- CWO 08-02, Shoreview Dr./Venetian Rd. Main Replacement, Bid Opening on 10/9/07 2pm
- CWO 07-154, Wixon Ave./Bayview Ct. Main Replacement, Bid Opening on 8/7/07 2pm
- CWO 07-142, Pringle Tank Recoat & Repair (Re-Bid), Bid Opening on 7/10/07 2pm
- CWO 07-37, Soquel Drive Main Replacement Project, Phase 1, Bid Opening on 7/03/07 2pm
- CWO 06-20, Tank Seismic Retrofit Phase II, Bid Opening on 5/29/07 2pm
- CWO 05-106, Lincoln Avenue Main Replacement and Main Extension, Bid Opening on 4/11/07 2pm
- CWO 07-126, La Selva Beach Main Replacements, Phase III, Bid Opening on 4/11/07 2pm
- CWO 07-103, Wixon Avenue Main Replacement Phase 1, Bid Opening on 2/13/07 2pm
- CWO 06-18, Dolphin Drive and Sumner Avenue Monitoring Well SC-A8, Bid Opening on 10/10/06 2pm
- CWO 07-102, Rio Del Mar Estates Tank Interior Recoat, Bid Opening on 9/26/06 2pm
- CWO 06-41, La Selva Beach Phase II Main Replacements, Bid Opening on 7/11/06 2pm
- CWO 06-38, Alta Drive Trench Paving Repair, La Selva Beach, Bid Opening on 6/2/06 2pm
- CWO 06-36, Rosedale Well Chemical Rehabilitation, Soquel, Bid Opening on 3/21/06 2pm
- CWO 06-27, Maintenance Building Painting, Soquel, Bid Opening on 2/7/06 2pm
- CWO 06-25, Fire Hydrant Installation at 1790 47th Ave., Capitola, Bid Opening on 2/7/06 2pm
- CWO 03-139, Country Club Well Power Service Upgrade, Aptos, Bid Opening on 12/20/05 2pm
- CWO 06-05, Well Systems Painting Project, Soquel, Bid Opening on 11/22/05 2pm
- CWO 06-17, Fire Hydrant Relocation & Restraint at 615 Encino Dr., Aptos, Bid Opening on 10/25/05 2pm
- CWO 06-06, Fire Hydrant Installation at 345 Dee Sheldon Way, La Selva Beach, Bid Opening on 10/11/05 2pm
- CWO 03-122, Aptos Junior High Well and Treatment Plant, Aptos, Bid Opening on 10/11/05 2pm
- CWO 05-128, Park Wilshire Tank Recoat, Aptos, Bid Opening on 9/15/05 2pm
- CWO 05-121, Baffy Court Main Replacement, Soquel, Bid Opening on 9/6/05 2pm
- CWO 03-124, La Selva Beach Phase I Main Replacements, La Selva Beach, Bid Opening on 7/19/05 2pm
- CWO 04-25, Stance Avenue Main Replacement, Soquel, Bid Opening on 5/10/05 2pm
- CWO 05-126, Tank Seismic Retrofit Project, Soquel, Bid Opening on 3/29/05 2pm
- CWO 04-30, T. Hopkins Arsenic Removal System Installation and Building Modifications, Aptos, Bid Opening on 3/1/05 2pm
- CWO 05-116, Meter Relocation at Capitola Del Mar Apartments, 1505 42nd Ave.,Capitola, Bid Opening on 1/11/05 2pm
- CWO 04-40, Center Street Main Replacement, Soquel, Bid Opening on 1/11/05 2pm
- CWO 05-112, Meter Relocation at Capitola Gardens 1770 44th Ave.,Capitola, Bid Opening on 11/9/04 2pm
- CWO 05-104, Crestline Tank No. 2 & Mar Vista Tank No. 2 Recoat and Repair Project, Soquel/Aptos, Bid Opening on 10/6/04 2pm
- CWO 01-136, Fire Hydrant Installation at 3025 Mar Vista Drive, Aptos, Bid Opening on 8/3/04 2pm
- CWO 04-29, Fire Hydrant Installation at 4175 Court Dr., Santa Cruz, Bid Opening on 7/13/04 2pm
- CWO 04-39, Ledyard Well Lining Installation, Aptos, Bid Opening on 5/25/04 2pm
- CWO 04-24, Soquel Dr. Main Replacement (Behind Soquel Post Office), Soquel, Bid Opening on 5/25/04 2pm
- CWO 04-38, Fire Hydrant Installation at Playa Blvd. & Solano Ave., La Selva Beach, Bid Opening on 4/29/04 2pm
- CWO 03-120, Monroe Avenue Area Main Replacements, Aptos, Bid Opening on 3/30/04 2pm
- CWO 04-33, Aqua View Tank No. 1 Interior and Nos. 1 & 2 Exterior Recoat and Repair Project, La Selva Beach, Bid Opening on 3/25/04 2pm
- CWO 04-35, Well Destruction at Aptos Par 3, Park Wilshire Nos. 1 & 2, Aptos, Bid Opening on 3/25/04 2pm
- CWO 04-27, Fire Hydrant Installation at 4750 Crystal Street, Capitola, Bid Opening on 2/19/04 2pm
- CWO 02-43, Fire Hydrant Upgrade at 303 Estrella Ave., La Selva Beach, Bid Opening on 2/19/04 2pm
- CWO 03-144, Headquarters Above Ground Fuel Tank Installation, Soquel, Bid Opening on 12/11/03 2pm
- CWO 04-05, Rosedale House Demolition, Soquel, Bid Opening on 11/12/03 2pm
- CWO 04-11, Aqua View No. 2 Tank Interior Recoat, La Selva Beach, Bid Opening on 10/30/03
- CWO 03-117, Treasure Island Main Replacements, Aptos, Bid Opening on 10/28/03
- CWO 04-10, Headquarters Shop Building Roof Replacement, Soquel, Bid Opening on 10/08/03
- CWO 04-06, Fire Hydrant Installation at 1550 Lincoln Ave., Capitola, Bid Opening on 09/09/03
- CWO 04-02, Fire Hydrant Installation at 423 Hillcrest Dr., Aptos, Bid Opening on 08/12/03
- CWO 03-141, Tannery Well Site Improvements, Soquel, Bid Opening on 07/29/03
- CWO 03-151, Opal Cliff Wharf Head Valve Installations, Santa Cruz, Bid Opening on 07/29/03
- CWO 02-17, Fire Hydrant Installation at 120 Richard Ct., Aptos, Bid Opening on 07/29/03
- CWO 02-38, Kingsbury Drive & Dorsey Avenue Main Replacements, Aptos, Bid Opening on 07/15/03
- CWO 03-144, Headquarters Above Ground Fuel Storage Tank Foundation, Soquel, Bid Opening on 06/17/03
- CWO 03-149, Fire Hydrant Installation at 1025 Huntington Dr., Aptos, Bid Opening on 06/03/03
- CWO 02-39, New Brighton State Beach Combined 8" x 2" Fire/Domestic Service and Fire Hydrant Installation, Capitola, Bid Opening on 05/27/03
- CWO 03-137, Shore Trails PRV Automation, Aptos, Bid Opening on 04/29/03
- CWO 03-146, Bayview Drive Main Replacement, Aptos, Bid Opening on 04/29/03
- CWO 03-145, Austrian Tank Interior Coating Redo, Aptos, (04/16/03)
- CWO 03-108, Ironwood Tank Remote Transmission Unit (RTU) Building Project, Soquel, Bid Opening on 03/25/03
- CWO 03-134, Main Street Well Chlorine Building Remodel Project, Soquel, Bid Opening on 03/25/03
- CWO 03-119, Rosedale and Tannery Treatment Plant Filter and Reaction Vessel Recoating Project, Soquel, (01/28/03)
- CWO 03-113, Garnet Street Well Site Landscaping, Capitola, (10/14/02)
- CWO 03-102, Austrian Tank Recoat and Repair Project, Aptos, (09/24/02)
- CWO 02-28, Grove Lane Main Replacement, Capitola, (09/24/02)
- CWO 03-106, 2001-2002 Valve Box Replacement, (09/12/02)
- CWO 02-42, Fire Hydrant Installation @ 3505 Putter Dr., Soquel, (09/10/02)
- CWO 02-26, 11 Fire Hydrant Installations in Various Locations for Aptos/La Selva Fire District, (08/13/02)
- CWO 02-45, Headquarters Underground Fuel Storage Tank Removal, (07/30/02)
- CWO 02-25, REBID Headquarters Fuel Island Replacement, (05/14/02)
- CWO 02-08, West Seacliff Area Main Replacements, (05/14/02)
- CWO 01-128, Tannery Well No. 2 Pump Station, (05/10/02)
- CWO 02-06, Polo Dr., North Dr. Lyon Ave., and Valencia Ave. Main Replacments, (04/30/02)
- CWO 02-16, Headquarters ADA Door Modifications, (04/25/02)
- CWO 01-127, Customer Service Field Office/Storage Building, (04/25/02)
- CWO 02-30, Fire Hydrant Installation at 4091Fairway Dr., (04/19/02)
- CWO 01-117, Rio Del Mar Cliffs Area Main Replacements Phase II, (03/12/02)
- CWO 01-142, REBID Fairway Tank Interior Recoat, (03/05/02)
- CWO 01-114, Ironwood Tank Replacement, (02/28/02)
- CWO 02-15, Fairway & Cornwell Tanks Cathodic Protection System, (02/15/02)




