Engineering
For construction or Engineering questions contact the Engineering Department at (831) 475-8500 or click here to email.
Standard Plans
- S -3 Standard Service Connection
- S-4 Service Reconnection
- S-5 6-Foot Chain Link Fence
- S-6 Buried Valve Assembly
- S-7 Thrust Block Details
- S-8 Meter Box Locations
- S-9 Fire Hydrant Assembly
- S-10 Fire Hydrant Placement and Clearances (Page 1/2 )
- S-10 Fire Hydrant Placement and Clearnances (Page 2/2)
- S-11 1-Inch Air and Vacuum Release Valve
- S-12 Blow-Off Assembly
- S-13 Casing Installation
- S-14 Longitudinal Trench Sand Backfill
- S-15 Trench Backfill Lateral (Cross) Trenches Sand/Cement Slurry
- S-16 3-Inch and Larger Fire Service or Back Flow Prevention Assembly (Page 1/2)
- S-16 3-Inch and Larger Fire Service or Back Flow Prevention Assembly (Page 2/2)
- S-17 2-Inch Fire Service Installation
- S-18 2-Inch and Larger Service with By-Pass
- S-19 ¾-Inch to 2-Inch Prevention Assembly Installation Reduced Pressure Principle Backflow
- S-20 2-Inch Fire and Domestic Combined Service Installation
- S-21 Reduced Pressure Principle Backflow Prevention Assembly: ¾-Inch to 2-Inch Parallel Installation
- S-22 Criteria for the Separation of Water Mains and Sanitary Sewers 1/3: Parallel Construction
- S-22 Criteria for the Separation of Water Mains and Sanitary Sewers 2/3: Crossings
- S-22 Criteria for the Separation of Water Mains and Sanitary Sewers 3/3: Materials
- S-23 Chlorination Tap
- S-24 Construction Project Sign
- S-25 Service Manifold
- S-26 Sampling Station
- S-27 1-inch Fire and Domestic Combined Service Installation
Standard Specifications
- Division One-General Conditions
- Division Two-General Technical Requirements
- Division Three-Materials and Construction
- Division Four-Design Criteria
- Appendix A-Cross Connection Policy




